Proven Projects Delivery Across Challenging Environments

150+ projects completed | Offshore, onshore, and swamp operations

TPLS Past Projects History

TPLS PAST PROJECTS HISTORY

Arranged Most Recent to Least Recent

S/N Project Name Location Period/Duration Client Client Contact
1 Procurement of electrical/instrumentation equipment for maintenance services Geometric Power Plant, Alaoji Aba June 2022 Tuma Power Services Limited – KSE Power Energy Andrew Amaje
2 Provision of Technical Services/consumables and equipment for Amandi Power Plant (75 MW) Takoradi Aboadze, Ghana April to June 2019 General Electric Bridget O
3 Various Heavy duty equipment Leasing Van-Oord Site NLNG Marine Base, PHC Nov. 2018 Van-Oord Marine Ingenuity Ajuma. A
4 Provision of Technical Services for Malembo Terminal Power Plant Project (Installation of GE TM 2500 Mobile turbine of 25MW and GE 4B Turbine of 75 MW) Malimbo Cabinda, Angola Oct. 2018 to Dec. 2018 General Electric Bridget O.
5 Heavy duty equipment Leasing G.E Site at Afam Power Plant July 2018 to Nov. 2018 General Electric Bridget O.
6 Call off Contract - STSNL OPERATION Provision of various electrical services and Special Services T/Amadi PH March 2016 - April 2017 Solar Turbine Nigeria Limited Dike Enyinnia
7 1 year running contract for Air conditional maintenance and installation services, Purchase and installation of new Air conditioners Trans Amadi Port Harcourt April 2016 - July 2017 Solar Turbine Services Nigeria Ltd Bob Badach
8 Workshop and Negris (2 nos door 20ft x 18ft) roller motor shutter doors procurement, fabrications repair, and installation Trans Amadi Port Harcourt Jan - Feb 2017 Solar Turbine Services Nigeria Ltd Bob Badach
9 Procurement/supply of Diesel Tank Sight Glass Gauge Trans Amadi Port Harcourt June - July 2017 Solar Turbine Services Nigeria Ltd Bob Badach
10 Diesel Storage Area Various Fabrication Projects - Construction Items and Diesel Area: Concrete manholes, 4 nos, for drainage. Containment tank drainage system Trans Amadi Port Harcourt April 2017 Solar Turbine Services Nigeria Ltd Bob Badach
11 Complete Shelf (Speed lock type) with Heavy Duty Shelving 400kg per shelf - 3 shelf levels Long 15 Meters, Height 2 meters, depth 455 millimeters - procurement, fabrication and installation Trans Amadi Port Harcourt April - May 2017 Solar Turbine Services Nigeria Ltd Bob Badach
12 Warehouse new emergency exit door – All galvanized materials - install a metallic complete door with anti panic system Trans Amadi Port Harcourt July 2017 Solar Turbine Services Nigeria Ltd Bob Badach
13 Pipe fabrication and Installation, Pipe Support, installation of the instruments on the transfer diesel suction pipe Trans Amadi Port Harcourt April 2016 - July 2017 Solar Turbine Services Nigeria Ltd Bob Badach
14 Engineering design, Procurement, Fabrication, Installation, Tie-in/Hookup and Commissioning of 6" Gas Line from Ebughu Platform to TMMP Platform to KAD at Addax Field Offshore OML 123 - Addax field Offshore June 2014 (4 Months) Oil & Industrial Services for Addax Petroleum Development Nig. Ltd OIS: Engr. Promise Amadi / Engr. Njoku Abraham
15 Replacement of Process Area 1 Platforms for 10A05 and 10A06 NNPC - Port Harcourt Refinery 2014 TPLS Paul
16 Repair of 2" Oil Recovery Line from T-200 at Izombe Flow Station OML 124 – Izombe field Addax Izombe field August 2014 Oil & Industrial Services for Addax Petroleum Development Nig. Ltd OIS: Engr. Promise Amadi / Engr. Njoku Abraham
17 16" Flare Header Sump Design & Fabrication, Drain Piping Modification, Fabrications, Repair and Installations OML 124 – Izombe field Addax Izombe field May 2014 Oil & Industrial Services for Addax Petroleum Development Nig. Ltd OIS: Engr. Promise Amadi / Engr. Njoku Abraham
18 20 Nos Valves Removal, Replacement And Installations At Izombe, Eze-Ossu And Ossu - Obodo Manifold OML 124 – Izombe field Addax Izombe field May 2014 Oil & Industrial Services for Addax Petroleum Development Nig. Ltd OIS: Engr. Promise Amadi / Engr. Njoku Abraham
19 Procurement of valves, pipes and fittings OML 124 – Izombe field Addax Izombe field April 2014 Technical Partners & Logistics Services Ltd Addax: Shola Durojaye
20 Piping modification, fabrication and installation of line from T200 to T25000 for Independent flow to Ebocha during Fiscalization OML 124 – Izombe field Addax Izombe field April 2014 Oil & Industrial Services for Addax Petroleum Development Nig. Ltd OIS: Engr. Promise Amadi / Engr. Njoku Abraham
21 Fabrication and Installation of 6" ADNB to ADNA Gaslift Pipeline Topsides Upgrade OML 123 - Addax field Offshore Feb 2014 OIS for Addax Promise Amadi / Njoku Abraham
22 Leak Points Repairs On Wet Drain Line At The Drain Pit Of 16 Inches Flare Line At Izombe Flowstation OML 124 – Izombe field Addax Izombe field March 2014 Oil & Industrial Services for Addax Petroleum Development Nig. Ltd OIS: Engr. Promise Amadi / Engr. Njoku Abraham
23 Procurement of 8 units of 10 Ton LG floor standing Industrial Air Conditioner STSNL Workshop March 2014 Solar Turbine Nigeria Limited Bob Badach
24 Procurement of Pipes and Fittings STSNL Workshop March 2014 Solar Turbine Nigeria Limited Bob Badach
25 12" x 12m each pipe and 5D bend internal pipe blasting and cleaning TPLS Fabrication Yard March 2014 TPLS -
26 Fabrication and installation of pipe supports of suction, discharge, gas, fuel and water lines for the new WIJ P-6400 pump hookup Addax Izombe Field Nov. 2014 OIS for Addax Promise Amadi / Njoku Abraham
27 Survey Identification and Coordination of vandalised clamps points on Addax 10 inches Main Oil export line from Izombe flow station to Ebocha at Agip OML 123 - Addax field Offshore April 2013 (3 Months) OIS for Addax Engr. Godwin Umeh Principal Engineer, Addax
28 Survey Identification and Setting out IP points Coordinates of 6 inches oil flowline on river and swamp between Eze-Osu manifold and Izombe flow station on Addax field (12Km Distance) OML 123 - Addax field Offshore June 2013 (2 Months) OIS for Addax Engr. Godwin Umeh Principal Engineer, Addax
29 Fabrication, Testing, Wrapping and Laying to Replacement (from Izombe manifold to each well head) 8Nos of Corroded 4" Flowlines / Gas Lines at OML123 Izombe field (35Km Distance) OML 124 – Izombe field Addax Izombe field Oct-Nov 2013 OIS for Addax Promise Amadi / Njoku Abraham
30 Sectional replacement of 2" Air and Gas Line at Izombe Flow Station OML 124 – Izombe field Addax Izombe field Nov. 2014 Oil & Industrial Services for Addax Petroleum Development Nig. Ltd OIS: Engr. Promise Amadi / Engr. Njoku Abraham
31 Rerouting and hookup of 12" ADNA Oil Line OML 123 - Addax field Offshore Nov-Dec 2013 OIS for Addax Promise Amadi / Njoku Abraham
32 Fabrication and Installation of 17 Wellheads Valves Access Platforms and Gratings on Well Head Pits and Around the Flowstation Drain Gutters at OML123 Izombe field All Well heads & Izombe flow station - Addax Izombe field July-Sept 2013 OIS for Addax Promise Amadi / Njoku Abraham
33 Flowline Sectional Repair of leak 2" and 4" gas lift line at Addax Izombe Flow station Well 10 - Addax Izombe field June 2013 OIS for Addax Promise Amadi / Njoku Abraham
34 Design, fabrication and installation of 4 nos. Offshore detachable stainless operator shelters for the satellites platforms (Akam, Egbuhu, Mimbo & Adanga) offshore Addax offshore April 2013 OIS for Addax Promise Amadi / Njoku Abraham
35 Design, Fabrication and installation of suction, discharge, gas, fuel and water lines for the new WIJ P-6400 pump hookup Addax Izombe Field February 2013 OIS for Addax Promise Amadi / Njoku Abraham
36 Fabrication of 3 nos. Ossu Obodo 14 well heads valves access platforms Ossu Obodo – Addax Izombe field January 2013 OIS for Addax Promise Amadi / Njoku Abraham
37 Design, fabrication and installation of 4 nos. stainless detachable Offshore operator toilet for the satellite's platforms offshore Addax offshore Dec. 2012 OIS for Addax Promise Amadi / Njoku Abraham
38 Fabrication and installation of a new detachable carbon steel at Meals hall (40ftx10ftx2.7m) caravan at Addax offshore platform Addax offshore November 2012 OIS for Addax Promise Amadi / Njoku Abraham
39 Dismantle existing office caravan, Design, fabrication and installation of a new detachable carbon steel at TMMP office (40ftx9ftx2.7m) caravan at Addax offshore platform Addax offshore August 2012 OIS for Addax Promise Amadi / Njoku Abraham
40 Design, fabrication and installation of 4 nos. Offshore detachable stainless operator shelters for the satellites platforms (Adanga RPP, ADSW, ADS, & ADSN) offshore Addax offshore July 2012 OIS for Addax Promise Amadi / Njoku Abraham
41 Recovery of all Redundant 4", 3" & 2" pipelines on Izombe Addax field, Imo State (38Km Distance) Addax Izombe Field April 2012 to December 2012 OIS for Addax Promise Amadi / Njoku Abraham
42 Design Modification, Fabrication, Testing and Installation of spools and valves and commissioning of V300 Water legs piping Addax Izombe Field April 2012 OIS for Addax Promise Amadi / Njoku Abraham
43 Sectional Replacement of corroded section IZ15-17RS Flow line Addax Izombe Flow station Addax Izombe Field March 2012 OIS for Addax Promise Amadi / Njoku Abraham
44 Fabrication and installation of leak points on suction line on WIJ Pump P600 Addax Izombe Field March 2012 OIS for Addax Promise Amadi / Njoku Abraham
45 Fabrication, repair, and Clamp of 3 numbers vandalized points on Addax 10 inches main oil line to Ebocha Opuoma Addax Izombe Field March 2012 OIS for Addax Promise Amadi / Njoku Abraham
46 Flow line Sectional Repair of rupture 4" gas lift line at Addax Izombe Flow station. Sectional Replacement of 4" gas lift line to 17/20 location, Addax Izombe station Addax Izombe Field March 2012 OIS for Addax Promise Amadi / Njoku Abraham
47 Procurement and Installation pressure pump with storage tank Solar Turbine workshop Jan. 2012 OIS for Addax Promise Amadi / Njoku Abraham
48 Fabrication, testing, protection, construction and Laying of 2nos 4" flowlines, 3.5KM each through land and swamp, Ossu 3 manifold through Ossu 4/6 to Ossu 14 and Eze Ossu, Addax field (7Km Distance) Eze Ossu and Ossu Obodo, Addax field Nov 2011 - Feb 2012 Mechanical Systems Ltd for Addax Shem Budaye
49 Fabrication, blasting, painting & Installation pipe line spools, EB-12 HT flow line, pipe spools, EB-12 HT flow line, EB-06 HT & 13 HT line pipe and its supports. EB-1 RS HT line pipe supports, water filling line and bottom flanges repairs, and fastening of grating at wellhead areas Adanga South Platform offshore Nov. 2011 (32 days) Mechanical Systems Ltd for Addax Shem Budaye
50 Material Procurement, Fabrication, Construction and installation of 2 units of steel galvanized materials 4 nos decks racks T/Amadi PH Nov-11 Solar Turbine Nigeria Limited Bob Badach
51 Fabrication and modification of 3" condensate line and rerouting of line to FWKO vessel (V300) Izombe flow station Nov-10 Mechanical Systems Ltd for Addax Shem Budaye
52 Fabrication, Testing and installation of Auto sampler Piping at Izombe flow station Izombe flow station May-11 O & G Solution for Addax Solar O.
53 Fabrication, Testing and installation of Auto sampler Piping at Addax / Agip receiving end facility, Ebocha Ebocha May-11 O & G Solution for Addax Solar O.
54 Fabrication, Construction and installation of steel gate, pvc steel coated mesh fence and panel pole of solar Turbine statalite T/Amadi PH Jan-11 Solar Turbine Nigeria Limited Nancy Oguayor
55 Fabrication and Hookup of Well 22 flow line to Addax flow station at Izombe Izombe Nov-10 Mechanical Systems Ltd for Addax Shem Budaye
56 Fabrication and Hookup of Well 21 flow line to Addax flow station at Izombe Izombe Sep-10 Mechanical Systems Ltd for Addax Shem Budaye
57 Piping Design and fabrication of Adanga redevelopment 3", 10" HP 12 LP headers production manifold and all 18 risers and piping branch connections (within 3 months) Adanga West platform offshore August 2010 - Nov 2010 Mevich Engineering Ltd for Addax Vincent Kpai
58 Fabrication of ADRP piping spools Adanga West platform Nov-10 Mevich Engineering Ltd for Addax Vincent Kpai
59 Fabrication of Akam Platform Pump Skid piping modification spools Akam platform offshore Nov-10 Mevich Engineering Ltd for Addax Vincent Kpai
60 Fabrication, blasting, painting and installation of corroded boat landing, hand rails, ladder, grating, and ADSW 18HT complete flow line section Adanga South-West platform (ADSW) Oct-10 Mechanical Systems Ltd for Addax Shem Budaye
61 Fabrication, blasting, painting and installation boat landing, frame structure base, hand rails, walkway, corroded steel plate, climbing stair case grating, Security bard wire installation at the top deck Ebughu Platform offshore Oct-10 (15 days) Mechanical Systems Ltd for Addax Shem Budaye
62 Fabrication and Hookup of 2" by pass fuel line from GIJ facility to flare down gas generators No. 801/802 fuel line Addax-Exterran facility Izombe Sep-10 (16 days) Mechanical Systems Ltd for Addax Shem Budaye
63 Fabrication of ring type stainless sand jetting for offshore vessel Adanga West platform Aug-10 Mevich Engineering Ltd for Addax Vincent Kpai
64 Fabrication, blasting, painting and installation 8" pipe boat landing frame structure base, hand rails, walkway, corroded steel plate, Helideck protector rail, climbing stair case grating at Bogi platform Bogi Platform offshore Aug-10 (30 days) Mechanical Systems Ltd for Addax Shem Budaye
65 Design Modification, fabrication, Installation, commissioning of IFS process facilities piping to accommodate treatment of expected wet Njaba crude oil line, and fabrication of section of pipeline on API/V-400 Discharge Line Izombe flow station Jun-10 Mechanical Systems Ltd for Addax Shem Budaye
66 Piping Design, Fabrication, installation and commissioning manifold for Njaba storage oil to T25000 tanks Izombe flow station Apr-10 Mechanical Systems Ltd for Addax Shem Budaye
67 Pipeline repair (hot tapping) of 10" Ebocha delivery line vandalized Ebocha Apr-10 Mechanical Systems Ltd for Addax Shem Budaye
68 Several Pipelines Sectional fabrication and replacement of 4" corroded flow line at Ossu for Addax Eze Ossu Apr-10 Mechanical Systems Ltd for Addax Shem Budaye
69 Under Dresser Kellogg on gas gathering Project (civil works only) Gas turbine base, concrete oil drains, concrete slabs, surface dressing, concrete tank stand Shell Location Agbada 33 June 2010 GBS & General Services Ltd for SPDC Ogechi Isaac
70 Procurement of materials: pipe, pipe fittings, valves and consumables Addax offshore platform and Izombe Eze-Ossu flowstation facility 2010 Mechanical Systems Ltd for Addax Shem Budaye
71 Rehabilitation and Maintenance of Shell Residential Quarters Port Harcourt Port Harcourt Oct. 2010 GBS & General Services Ltd for SPDC Chika Nnadi
72 German flooring of oil well head at Agbada 33 Port Harcourt Nov. 2010 GBS & General Services Ltd for SPDC Chika Nnadi
73 Rehabilitation and Maintenance of Shell Residential Quarters, Port Harcourt Port Harcourt August 2009 GBS & General Services Ltd for SPDC Chika Nnadi
74 De-roofing and roofing of 5 room caravan Port Harcourt Aug-09 (2010) GBS & General Services Ltd for SPDC Chika Nnadi
75 Drainage construction at Pelemabri Pelemabri Jul-09 Bayesa State Government Chika Nnadi

Note: Projects highlighted in yellow indicate ongoing or most recent contracts (2018-present). For detailed information on any specific project, please contact TPLS directly.

Client Testimonials

TPLS demonstrated exceptional project execution capability on our offshore gas line project. Their attention to detail and safety focus were exemplary.
Addax Petroleum
Engineering Project Coordintor/ Sponsor
We've worked with TPLS on multiple projects. Their reliability and technical competence keep us coming back.
General Electric
Project Manager